AQW 1132/16-21 Written question to the Minister for Infrastructure
To ask the Minister for Infrastructure what plans are in place to deal with the periodic flooding of sections of Newtownbreda Road in South Belfast.
Asked by Paula Bradshaw MLA on 14 June 2016
- Answered
- Written
- Tabled
- 14 June 2016
- Answer due by
- 29 June 2016
- Answered
- 28 June 201614 days after tabling
- Department
- Department for Infrastructure
- Priority question
- No
Answer
I have been advised by NI Water that an investigation into out of sewer flooding on the Newtownbreda Road was completed in May 2016. The report confirms that out of sewer flooding occurs as a result of incapacity in the sewerage system and includes a concept option for a capital project to reduce the flood risk at this location. Work is ongoing to inform this option, including initial ground investigation work, which is planned to commence in July 2016.
Following completion of this ground investigation, NI Water will be in a position to confirm if the concept option for the proposed solution is viable.